Survey Type:ApplicantJob Number:000A-CU9095Survey Date:22-Jun-2026Inside Survey?:NoContact Name:Robert J. KreuzerContact Title:Senior Vice President | Risk ControlContact Phone:W: 860.277.7601 F: 877.426.3490 C: 860.997.2545Contact E-mail:RKREUZER@travelers.com

Risk Control Consultant

RCC Name:Max DruckerRCC Title:Senior Risk Control ConsultantRCC Phone:

Report Content

  • Property

Lines of Coverage

  • Building
  • BPP - Furniture & Fixtures
  • Business Income

Location

Street Address 1:99 Lamberton RdCity:WindsorState:CTZip Code:06095SIC Code:SIC Description:

Executive Summary

Applicant property survey for Travelers Claim University — the carrier's flagship claims technical-training facility at 99 Lamberton Rd, Windsor, CT. The building is a purpose-built, owner-occupied training campus: a 2-story office/classroom block attached to a high-bay lab hall (heavy-equipment lab, auto-appraisal lab, full-scale furnished houses, convenience-store mockup), 183,263 sq ft assessor-measured on a 21.69-acre low-density industrial campus, outside the FEMA Special Flood Hazard Area (Zone X). Construction quality Average (2.0). A ground-mount solar field (Verogy, ~5.7 ac) is proposed behind the building. Carrier-supplied insured values, the Commercial Express valuation, construction-class split, percent-sprinklered, and the loss-run are pending and will complete the property and PML sections.

How This Report Was Assembled

Carrier draft data backfilled into the Pulse report, ahead of field capture

Carrier draftAssessor / public recordField — to confirm
Why this survey was requested

This submission was routed to Loss Control by the underwriter on the insured-premises square-footage signal — a premise greater than 50,000 sq ft operating as an educational/training center. The areas of interest carried into the field were 'Property — Insured Premises Sqft' and the educational-training-center trigger.

What was backfilled here

The General Information, Account, Property/COPE profile, value-subject, and site-exposure data on this report were backfilled from the carrier-supplied draft Travelers Risk Control report — the information that does not come from a field capture. Carrier-supplied insured values, the Commercial Express valuation, the ISO construction-class split, percent-sprinklered, and the loss-run are marked pending and are not fabricated.

What a field capture adds on top

A field capture for this survey contributes the hazard-checklist answers, captured photos, and the AI hazard assessment, which are attached on top of this content by the report loader. Those will populate the recommendations and risk-quality scoring; the property identity and valuation framing on this page do not depend on them.

6/23/26, 4:00 PMFor Internal use only

Property Profile (COPE)

Carrier draftAssessor / public record
Account name (legal):Travelers Indemnity Company (Claims University)Travelers job number:000A-CU9095ASAI number:6904T9072NAICS:611430 — Professional and Management Development TrainingPrimary occupancy:Public Buildings — School / Training FacilityOwner-occupancy:Owner-occupied by The Travelers Indemnity Company; Kleinfelder, Inc. occupies office space (Suite 201)Floor area (value subject):183,263 sq ft (Assessor measured)Core training hall:~108,000–110,000 sq ft; P&Z gross non-residential floor area 186,000 sq ftYear built:1964 (effective year built 1998; Travelers fit-out 2006–07)Stories:2 (office/classroom block) + high-bay single-level lab hall (mixed height)Building shape:Irregular (office block + attached high-bay lab hall)Construction quality:Average (2.0)Construction class (ISO):To confirm in field — class split pending Commercial Express valuationPercent sprinklered:To confirm in fieldFacility opened:2007 (building constructed 1964)
Building composition

Travelers Claim University is a purpose-built training facility organized around hands-on lab space: an office/classroom block (2 stories) attached to a high-bay single-level lab hall, giving the structure an irregular footprint and mixed story heights. The building was originally constructed in 1964 as an industrial building and received a Travelers fit-out in 2006–07 (effective year built 1998). Assessor-measured floor area is 183,263 sq ft; the core training hall is approximately 108,000–110,000 sq ft, and the Planning & Zoning gross non-residential floor area is 186,000 sq ft. Construction quality is rated Average (2.0). ISO construction-class split and percent-sprinklered are to be confirmed in the field and via the Commercial Express valuation.

Description of Operations

Carrier draft
Industry:Insurance Claims Training & Professional Development FacilityYears in business:Facility opened 2007 (building constructed 1964)Gross receipts:UnknownForeign exposures:NoneWebsite:travelers.com/claims/capabilities/specialized-support/claim-university
Operations

Travelers Claim University is the carrier's flagship technical-training and professional-development facility, opened in 2007 at 99 Lamberton Road, Windsor, CT. The facility provides technical training and leadership development to more than 10,000 Claim professionals annually using traditional and online classes, experiential learning, specialized labs, and digital media. Approximately 8,500 front-line employees attend in person each year for hands-on training in auto, property, heavy equipment, or liability claim appraisal, with another 8,500+ trained via virtual/distance learning.

Hands-on lab space

The building houses the industry's first heavy-equipment lab (cranes, backhoes, bulldozers, and other heavy-duty vehicles), an auto-appraisal lab equipped with the Chief Automotive Fuzion vehicle repair and sectioning system, full-scale furnished houses, and a convenience-store mockup, supplemented by traditional classrooms, online/distance-learning studios, and digital-media facilities.

6/23/26, 4:00 PMFor Internal use only

Value Subjects & Building Valuation

Carrier draftField — to confirm
Number of value subjects:1 (single primary building)Main value subject:Travelers Claim University — main training buildingFloor area of value subject:183,263 sq ftBuilding (insured value):Carrier-supplied — pendingBPP — Furniture & Fixtures (insured value):Carrier-supplied — pendingBusiness Income (insured value):Carrier-supplied — pendingTotal location insured value:Carrier-supplied — pendingCommercial Express Valuation ID:Valuation required — pendingReconstruction cost (all buildings of this style):Valuation required — pending
Valuation note

A single primary value subject is present at this location: the Travelers Claim University main training building (183,263 sq ft). Building, BPP — Furniture & Fixtures, and Business Income insured values, the Commercial Express Valuation ID, and the building reconstruction cost are carrier-supplied and pending; the building ITV will be confirmed once the Commercial Express valuation is returned. Construction-class percentages (Fire Resistive / Modified Fire Resistive / Masonry Noncombustible / Noncombustible / Joisted Masonry / Frame) are field items to confirm.

Property — Loss Analysis

Carrier draft
Carrier loss-run:Required — pendingNotable loss activity:Pending carrier loss-run
Loss analysis

Loss analysis is pending the carrier loss-run. On receipt, this section will summarize notable loss insights or trends (positive or negative), loss details and underlying cause(s), and corrective actions taken or still needed.

6/23/26, 4:00 PMFor Internal use only

Site, Zoning & Exposures

Carrier draftAssessor / public record
Site:21.69-acre, low-density industrial-zoned campus on the north side of Lamberton RoadFEMA flood zone:Zone X — outside the Special Flood Hazard Area
Site identity / history note

The property occupies a 21.69-acre, low-density industrial-zoned campus on the north side of Lamberton Road, located outside the FEMA Special Flood Hazard Area (Zone X). History note: this parcel — a 1964 industrial building given a Travelers fit-out in 2006–07 — is distinct from the former Combustion Engineering nuclear/turbine manufacturing site at 2000 Day Hill Road, Windsor (approx. 8 miles away). The Combustion Engineering radiological (FUSRAP) and asbestos legacy does NOT attach to 99 Lamberton Road.

Notable, recent or planned changes

Proposed ground-mount solar field (Verogy, ~5.7 acres) behind the building; red umbrella monument sign approved Jan-2026. No foreign exposures.

Risk Quality Grade

Overall Risk Quality Grade (Location)

GradeScoreRange
Superior8885–100
Overall Risk Quality Points:12

Probable Maximum Loss

Peril:FirePML Likelihood:LowBuilding PML Calculation Method:Engineering Judgment PML MethodBuilding PML:0%Building PML Amount:0 USD
Total Business Income PML Amount:0 USDReconstruction Cost:0 USDAdjusted Total PML based on Reconstruction Cost:0 USD

Value Subject

Travelers Claim University — main training building (183,263 sq ft)

6/23/26, 4:00 PMFor Internal use only

AI Loss-Control Assessment

Media-Based Risk Findings

The captured media depicts a generally well-maintained educational training campus presenting a favorable overall loss-control picture, with multiple fire and life-safety controls confirmed in place. Documented controls include a properly mounted firetube steam boiler on housekeeping pads, labeled and placarded electrical distribution gear, an NFPA 25 sprinkler inspection invoice (wet/dry systems, fire pump, alarm devices), an intact pendent sprinkler head, a current/charged fire extinguisher (inspected 02-15-2026, PASS), smoke detectors, and a code-compliant exit stairwell with illuminated signage. The underwriter's interest in the premises being a >50,000 sqft educational training center is supported by the facility floor plan showing a large single-story campus with multiple classrooms and labs (Auto Lab, Heavy Equipment Lab, etc.); however, the media does NOT capture explicit square-footage figures or measurements, so the specific 'Property Insured Premises Sqft' / 'Insured Premises Sqft' values were not directly documented and remain unverified by the photos. Only minor, advisory-level maintenance items were observed, primarily at the ground-mounted solar PV array.

ConcernSeveritySourceRecommended ActionUnderwriter Interest
Torn/deteriorated insulation wrap on ceiling/ductworkLOWImageRepair or replace the damaged insulation wrap at the affected seams/edges to restore thermal performance and prevent material shedding.
Bird nesting in solar rackingLOWVideoRemove the bird nest from the torque tube/support post connection and implement periodic inspection/deterrence to keep combustible material away from wiring and junction points.
Vegetation growth around ground-mounted electrical equipmentLOWVideoEstablish a routine vegetation-management program to maintain clearance around switchgear, inverters, and conduit at the solar installation.

Derived Risk Quality

Grade: Superior (score 88, range 85–100). Drivers: 3 low-severity concerns; Field capture 68% complete (26/38 fields).

Generated by claude-opus-4-8 · 80% confidence · 6/25/2026, 3:28:41 PM · AI-drafted, pending consultant review.

6/23/26, 4:00 PMFor Internal use only

Evidence Location Verification

Capture-time GPS stamps verified against the insured location

Evidence location: 0 of 17 captures verified on site · 17 without location data

Captures with location data:0On-site verified (≤ 300 m):0Near site (≤ 1,500 m):0Location mismatch (> 1,500 m):0No location data:17

Location stamps are recorded by the capture device at the moment each photo, video, or voice memo is taken and compared against the geocoded property address. Items without location data predate location stamping or were captured with location services unavailable.

6/23/26, 4:00 PMFor Internal use only

Photo Risk Assessment

Per-image AI analysis of the captured field photos

Fire exposure & controls effectiveness
Risk Assessment
Fire exposure & controls effectiveness

The photo shows a ceiling area covered in white insulation wrapping that is torn and frayed at the seams and edges. A diagonal metal pipe with a light fixture crosses the frame, and additional vertical pipes and conduit run along the right side of the image.

LOW
Torn/deteriorated insulation wrap

Frayed and split insulation covering on ceiling/ductwork can degrade thermal performance and shed material; not an immediate life-safety issue.

Recommend: Repair or replace torn insulation wrapping to restore covering integrity and prevent further fraying.

55% confidence · AI-drafted, pending consultant review.

6/23/26, 4:00 PMFor Internal use only

Video Risk Assessment

Per-video AI analysis of the captured walkthrough footage

Video
Risk Assessment
Bird nest on ground mount solar racking

The walkthrough shows a man inspecting the underside of a ground-mounted solar panel array set in tall grass, photographing a bird nest built on the steel cross-member/torque tube where it meets a support post. The inspector narrates that there are live birds observable in the nest, joking he will call them 'birdie birds.' No building interior or square footage is shown. Transcript: “Oh, we'll do a video of that, too. Yeah, we will. Yeah. And there's live birds that we're able to observe here and there. So, the contactor type is a live bird. We're going to call them birdie birds.”

LOW
Bird nesting in solar racking

Bird nests and droppings on solar mounting hardware can accumulate combustible material near wiring/junction points and accelerate corrosion, a minor maintenance exposure for a ground-mount PV array

Recommend: Schedule humane nest removal after fledging and implement routine inspection and bird-deterrent measures on racking near electrical connections

71% confidence · AI-drafted, pending consultant review.

Video
Risk Assessment
Outdoor solar array electrical equipment enclosures

The walkthrough shows two men approaching a fenced outdoor ground-mounted solar installation on a gravel pad, with one man photographing the equipment on his phone. Visible are large metal switchgear cabinets, combiner enclosures, conduit runs, and a row of string inverters tied to a solar panel array behind the chain-link fence. The narration is garbled and does not provide a coherent description of the site or any specific safety call-outs. Transcript: “And now we are at the end of the video. I wouldn't get any closer than that. And when I get there, I'm not going to be working. Right here at the St. Louis Health Center, we have all of this. With my power, I'm going to be covering this morning.”

LOW
Vegetation growth around electrical equipment

Weeds and grass encroaching at the base of energized switchgear and conduit can impede access and present minor fire/maintenance concerns at a solar site.

Recommend: Maintain a clear vegetation-free zone around all electrical enclosures and inverter racks.

35% confidence · AI-drafted, pending consultant review.

6/23/26, 4:00 PMFor Internal use only

Field Documentation

Captured during the on-site walkthrough

Primary heating type
Primary heating type
CO detection where fuel-burning / garage adjacency?
CO detection where fuel-burning / garage adjacency?
Panel / wiring free of overload & damage? — capture evidence
Panel / wiring free of overload & damage? — capture evidence
Latest sprinkler maintenance contract / bill
Latest sprinkler maintenance contract / bill
Sprinkler heads clear & undamaged? — capture proof
Sprinkler heads clear & undamaged? — capture proof
Portable extinguisher inspection — capture tag
Portable extinguisher inspection — capture tag
6/23/26, 4:00 PMFor Internal use only
Egress / stairwells clear and lit?
Egress / stairwells clear and lit?
O&M grade
O&M grade
Emergency Response Plan rating
Emergency Response Plan rating
Snow/ice, pool, or other notable exposure?
Snow/ice, pool, or other notable exposure?
Capture the array
Capture the array
PV system description
PV system description
6/23/26, 4:00 PMFor Internal use only
PV system description
PV system description
Ground mounted solar inverters in fenced array
Ground mounted solar inverters in fenced array