AR

Carpe Pulse

704B-L8EK3I

PIONEER SOLAR GENERATION FACILITY — NEW HAVEN · Solar · In Field

Survey Queue
PIONEER SOLAR GENERATION FACILITY — NEW HAVEN
, NEW HAVEN , CT · Job 704B-L8EK3I
0
Photos
0
Intake
0
AI reads
Superior
Risk grade
Reference

Survey Request (from MRE)

MRE request
BusinessPioneer Solar Generation Facility — New Haven
Pending

Probable Maximum Loss (PML)

Fire
PerilFire
LikelihoodLow
Calc methodEngineering Judgment PML Method
Building PML %0%
Building PML $0 USD
BI PML $0 USD
Operations
No operations detail recorded for this survey yet.
Financial / Loss
Valuation and loss analysis are pending carrier-supplied data.
AI· Opus 4.8

AI Loss-Control Assessment

No AI assessment has been run on the captured media yet.
Recommendations
No recommendations yet. Run field capture / AI assessment, or use “Derive from findings”.
Field Data
Captured· Field

Field Documentation

0 Photos

No field data captured yet.

Start Field Capture
Powered byCarpe Data